My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-07-14_PERMIT FILE - C1981010A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2023-07-14_PERMIT FILE - C1981010A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2023 9:05:37 PM
Creation date
8/4/2023 11:13:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
7/14/2023
Doc Name
pgs 3-1 to 3-101
Section_Exhibit Name
3.0 Project Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Station descriptions are shown below: <br />Station 1 — Installed in Sept. 2009; borehole with piezometer and inclinometer set-ups;GPS station; <br />Removed in May, 2010 due to the normal advancement of mining operations. <br />Station 2 — Installed in Sept. 2009; borehole with piezometer and inclinometer set-ups; Removed in <br />June, 2011 due to the normal advancement of mining operations. <br />Station 3 — Installed in Sept. 2009; borehole with piezometer and inclinometer set-ups; GPS station; <br />Removed in March, 2011 due to the normal advancement of mining operations. <br />Station 4 — Installed in Sept. 2009; borehole with piezometer and inclinometer set-ups; GPS station; <br />Removed in June, 2011 due to the normal advancement of mining operations. <br />Station 5 —; Installed in June, 2011; borehole with piezometer and inclinometer set-ups; GPS <br />station; Removed in August, 2012, due to the normal advancement of mining operations. <br />Station 6 - Installed in Sept., 2011; borehole with piezometer and inclinometer set-ups; Removed in <br />Sept. 2012, due to the normal advancement of mining operations. <br />Station 7 - Installed in July, 2011; borehole with piezometer and inclinometer set-ups; GPS station <br />Station 8 - Installed in July, 2011 -borehole with piezometer and inclinometer set-ups; GPS station <br />Station 9 -Installed in May, 2014 -GPS Station. <br />Station 10 -Installation in progress (Tentative July 2014) -GPS Station. <br />Each borehole is continuously monitored with an automatic data acquisition system. The acquisition <br />system shares power and telemetry with the GPS system via Intuicom radios. These radios transmit <br />data through repeater stations to the Trapper Mine office. The inclinometer and piezometer data is <br />saved to a server in the Trapper Mine office. The GPS data is processed on the same Trapper Mine <br />server. All data is transferred to a secure SNC Lavalin Transportation USA Inc. Data Center server. <br />All data is archived both on the secure SNC Lavalin Transportation USA Inc Data Center server. All <br />data is archived both on the Trapper Mine server and the data center server. <br />Instrumentation locations are shown in Table 3.3-4. <br />Station locations are shown on Figure 3.3.3-1. <br />Stations may be added or deleted as mining progresses through the slide area. <br />Selected data from active monitoring stations will be provided to DRMS semi-annually (March and <br />September). <br />JUL 0 8 2014 3-27b Revision: Pl't —U 7 <br />Approved: <br />
The URL can be used to link to this page
Your browser does not support the video tag.