Laserfiche WebLink
Bowie No 1 Mine (Permit No. C-1981-038) <br /> Permit Renewal No.8 <br /> Stipulation No. 26 <br /> ONE YEAR AFTER THE COMPLETION OF RECLAMATION ACTIVITIES AT THE <br /> LOADOUT, THE OPERATOR SHALL COMPARE THE SOIL CHARACTERISTICS OF THE <br /> RECLAIMED AREA WITH THE ADJACENT UNDISTURBED ORCHARD AREAS TO <br /> VERIFY THAT THE HYDROLOGIC FUNCTION OF FLOOD IRRIGABILITY HAS BEEN <br /> RESTORED. SUCH COMPARISON SHOULD BE IN THE FORM OF INFILTRATION, <br /> PERMEABILITY AND TEXTURE STUDIES. <br /> Stipulation 29 <br /> THE OPERATOR SHALL CONTINUE TO SUBMIT TO THE DIVISION AN ANNUAL <br /> REPORT OF INFLOWS, DISCHARGES, AND CONSUMPTION OF WATER WITHIN THE <br /> MINE. THIS REPORT IS TO INCLUDE A MINE WORKINGS MAP SHOWING THE <br /> LOCATION AND QUANTITY OF INFLOWS; A TABLE KEYED TO THE MINE MAP <br /> WHICH SHALL CONTAIN THE SOURCE (I.E., FAULT, FRACTURES, ETC.), QUANTITY, <br /> DURATION AND QUALITY (I.E., PH, ELECTRO-CONDUCTIVITY AND <br /> TERMPERATURE) OF ALL MEASURABLE INFLOWS; A TABLE CONTAINING <br /> RECORDS OF WATER IMPORTED FOR USE WITHIN THE MINE;A DISCUSSION OF THE <br /> WATER BALANCE. <br />