Laserfiche WebLink
the case, as surface facilities of an underground mine are considered to be surface coal <br /> mining operations, therefore rendering Bowie No. 1 Mine subject to Rule 4.27. A <br /> requirement for Bowie No. I Mine's compliance with Rule 4.27 was partially addressed in <br /> Stipulation No. 43 of the Permit Renewal No. 2 decision. This stipulation was complied <br /> with through the submittal and approval of Minor Revision No. 86, which updated Section <br /> 2.06 of the PAP to include steep slope mining as part of the mining plan. <br /> Technical Revision No. 28 detailed the backfilling and grading reclamation requirements <br /> for the cut and fill areas of the mine site. The cut and fill areas are to be restored to <br /> approximate original contour except for a post-reclamation access road. The present haul <br /> road and access road are to remain, although narrowed to a 16-foot width. The access road <br /> will be positioned inside a 20-foot wide terrace corridor running the length of the road. <br /> XXL In Situ Processing - Rule 4.29 <br /> This section is not applicable to the Bowie No. I Mine. <br /> 45 <br />