Laserfiche WebLink
San Luis TSF David Carino <br /> 2023 Annual Dam Safety Inspection Battle Mountain Resources,Inc. <br /> Table 1 San Luis TSF Piezometer Levels: April 2022 -May 2023 <br /> PIEZOMETER ID P6 P7 P8 P9 P10 P11 P12 P13 P14 P15 <br /> TOTAL DEPTH(ft)" 72.46 92.50 97.51 72.30 58.30 41.80 41.71 41.34 41.24 41.10 <br /> 4/27/2022 72.46 92.29 96.58 71.93 57.47 41.40 41.66 41.02 41.24 40.87 <br /> 5/31/2022 72.46 92.28 96.64 71.94 57.49 41.39 41.65 41.01 1 41.24 40.87 <br /> 6/30/2022 72.46 92.30 96.62 71.93 57.48 41.41 41.65 41.01 41.24 40.87 <br /> 7/28/2022 72.46 92.30 96.65 71.94 57.49 41.41 41.65 41.01 41.24 40.87 <br /> 8/31/2022 72.46 92.50 96.65 71.93 57.49 41.40 41.65 41.00 41.24 40.86 <br /> 9/29/2022 72.46 92.50 96.65 71.93 57.48 41.40 41.64 41.00 41.24 40.85 <br /> 10/31/2022 72.46 92.50 96.64 71.92 57.48 41.39 41.65 41.00 41.24 40.86 <br /> 11/30/2022 72.46 92.50 96.68 71.94 57.47 41.40 41.64 40.99 41.24 40.85 <br /> 12/30/2022 72.46 92.50 96.67 71.94 57.48 41.40 41.65 41.00 41.24 40.85 <br /> 1/31/2023 72.46 92.50 96.66 71.95 57.48 41.41 41.63 41.03 41.24 40.84 <br /> 2/28/2023 72.46 92.50 96.67 71.95 57.47 41.40 41.64 41.00 41.24 40.80 <br /> 3/30/2023 72.46 92.50 96.67 71.95 57.47 41.40 41.63 41.02 41.24 40.85 <br /> 4/27/2023 72.46 92.50 96.65 71.95 57.48 41.39 41.63 41.03 41.24 40.86 <br /> *Piezometer total depths measured from top of casing <br /> Underdrain: Underdrain flow rates discharging to the seepage collection pond from April 2022 <br /> through May 2023 are shown in Table 2, and flow rates from 2016 to 2023 are presented <br /> graphically on Figure 4. Average underdrain flow measurements from 2020-23 (31.7 gpm) are <br /> slightly lower than from 2016-2023 (34.0 gpm). <br /> The underdrain pipes were jet-cleaned in 2014 in conjunction with the first camera inspection of <br /> the accessible downstream ends of the pipes. A second video inspection of the pipe ends was done <br /> without jet cleaning in 2018. The 2018 videos showed some accumulation of sediment and <br /> precipitates in the pipes compared to the 2014 videos, but the pipes were all still flowing (not <br /> clogged). Thus, the observed slight reduction in underdrain flow in recent years is likely due to <br /> ongoing severe regional drought. The pipes were jet-cleaned again on October 5, 2020, and May <br /> 10, 2021, with no video inspections. It is recommended that jetting of the pipes and video <br /> inspections be conducted at least every 3 years unless a change in measured drainage flow rates <br /> warrants more frequent cleaning and inspection. <br /> 2 Engineering Analytics,Inc. <br />