My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-04-19_PERMIT FILE - C1981010 (124)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2023-04-19_PERMIT FILE - C1981010 (124)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2023 9:32:29 AM
Creation date
7/24/2023 9:31:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Permit File
Doc Date
4/19/2023
Doc Name
East Buzzard Hydrologic Model
Section_Exhibit Name
Appendix Q Section II
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEDCAD 4 for Windows <br /> f nrnw:nhf 9QQA-IAIA P-a I Cnh-h <br /> Structure Detail: <br /> Structure #1 (Pond} <br /> East Buzzard No. 3 <br /> Pond Inputs: <br /> Initial Pool Elev: 6,247.00 ft <br /> Initial Pool: 0.68 ac-ft <br /> *Sediment Storage: 1.00 ac-ft <br /> Dead Space: 0.00% <br /> *Sediment capacity was entered by user <br /> Emergency Spillway <br /> Spillway Elev Crest Length Left Right Bottom <br /> (ft) 5ideslope S,deslope Width(ft) <br /> 6,247.00 35.00 2.00:1 2.00:1 5.00 <br /> Pond Results: <br /> Peak Elevation: 6,247.46 ft <br /> H'graph Detention Time: 0.35 hrs <br /> Pond Model: CSTRS <br /> Dewater Time: 0.67 days <br /> Trap Efficiency: 16.95% <br /> Dewatering time is calculated from peak stage to lowest spillway <br /> Elevation-Ca aci -Dischar a Table <br /> Area Capacity Discharge Dewater <br /> Elevation Time <br /> (ac) (ac-ft) (cft) (hrs) <br /> 6,244.81 0.272 0.000 0.000 Top of Sed. Storage <br /> 6,245.00 0.278 0.053 0.000 <br /> 6,245.50 0.294 0.196 0.000 <br /> 6,246.00 0.311 0.348 0.000 <br /> 6,246.50 0.328 0.507 0.000 <br /> 6,247.00 0.346 0.676 0.000 Spillway#1 <br /> 6,247.46 0.364 0.838 5.579 16.00 Peak Stage <br /> 6,247.50 0.366 0.854 6.113 <br /> 6,248.00 0.386 1.041 12.225 <br /> 6,248.50 0.408 1.240 29.053 <br /> 6,249.00 0.430 1.449 51.018 <br /> 6,249.50 0.456 1.670 79.819 <br /> Filename:East Buzzard 202210 yr event.sc4 Printed 05-09-2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.