Laserfiche WebLink
E. Other Disturbances (please describe) <br /> Existing roads and trails will be utilized and improved as necessary to allow for safe <br /> access. improvements will include tree trimming1removal, blading, adding fill, an <br /> stabilizing washout areas with fill material. <br /> F. Indicate Chemicals and Fuels used or stored on site. List type, quantity and method to <br /> store. <br /> Chemicals and fuels used on-site may include diesel fuel, gasoline, hydraulic fluid, and <br /> lubricating grease. Approximately 300 gallons of dieselfuel and gasoline will e stored in <br /> fuel delivery systems on drill rigs and support vehicles. Approximately 50 pounds of <br /> lubricating grease and 35 gallons of hydraulic fluid will be stored on each drill rig and <br /> transported by drill trucks. <br /> G. New Roads: <br /> Length (ft): 3,920 Width (ft): 14 <br /> Significantly <br /> Upgraded Roads Length (ft): 1 ,940 Width (ft): 12 <br /> Are culverts or other crossings proposed? If so, pleLe describe: <br /> None are proposed in the amended NOI. <br /> H. Total project area to be disturbed (acres) 3.82 acres proposed+0.97 ac authorized;Total 4.79 ac <br /> 1. Describe the equipment to be used for the prospecting operations: <br /> Exploration drilling and personnel will access the site in pickup trucks. A reverse <br /> circulationdrill will e utilized along with support vehicles, such as a pipe truck or <br /> trailer, water truck, forklift, and portable light plant/generator. It is anticipated that only <br /> one drill rig will be on site at any one time. A bulldozer or excavator and a backhoe may <br /> Form 2—Public File Page 7 of 14 <br />