Laserfiche WebLink
3. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and <br /> redistributed for the re-establishment of vegetation. Specify approximate topsoil <br /> redistribution depth: <br /> No natural topsoil will be disturbed by any activity. All drill locations have a loose hard <br /> Feek base. Mill tails aFe eapped with a sandy leaFn FniXtHFe bFeUght te the site ftern <br /> previous remediation work. The capped sandy loam mixture will be stripped and set <br /> aside. I he cap has an approximate depth o - Once the excavation is completed <br /> the capped material will be re-set and contoured. <br /> Material to be loaded into super sacks and trucked from location. <br /> 4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required <br /> abandonment procedures): <br /> 8 exploration wells to be drilled up to maxium depth of 500'. Under rule 5.4.3 temporary <br /> a 3ndonment noles to be capped. Drillhole will be diameter. <br /> Holes to be cased with PVC pipe, <br /> 5. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be <br /> reclaimed (refer to Rule 3 and Rule 5 for specific reclamation performance standards). <br /> You may wish to contact the Division for closure specifications. <br /> Not applicable. <br /> Form 2—Public File Page 9 of 14 <br />