Laserfiche WebLink
5. Describe proposed surface excavation or other land disturbance, including roads, pits, <br /> trenches,waste piles, drill pads and collar areas of underground workings,ponds, etc. <br /> Removal of up to 100 tons of existing mill tails for the purpose of process testing Exploration drilling of"level 14"at the surface and <br /> within the"level 14"tunnel All access will be completed with existing roads.All activities will occur within the lower Camp Bird's <br /> current operational area <br /> To ie 106 toms of i i i"I tail material will be removed froi i i the Nurth aide of the..ode ffla tails The material vvi"be taken fron,the aiess <br /> furthest away from the slope of Canyon Creek.Overburden and sand cap will be stripped and set aside The material will be <br /> excavated in increments.After excavation,the area will be refilled with sand material and re-contoured <br /> All drill locations within current permitted boudary and within the patented lands of the company Drilling for the purpose of core <br /> samples.Watei foi di illing will come f,on,level 14 adit.Di illwily Ywastewate, will be collected n ito poi table closed conta,ie,s al id <br /> disposed of into the settling pond on site.Drill pads will be standard with the intent of core drilling. <br /> Vegetation minimal to non-existant thus vegetation disburtance would be limited to none. <br /> 6. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, <br /> including anticipated number of holes, diameter, depth, location, etc. Submit additional <br /> pages if necessary: <br /> A. Drill Pads: <br /> Average Average <br /> Quantity 2 Width (ft) 20 Length (ft) 20 <br /> B. Drill Holes: <br /> Diameter <br /> Quantity 8 Depth (ft) 100 (in) 2 <br /> C. Mud Pits <br /> Average Average Average <br /> Quantity Width (ft) Length (ft) Depth (ft) <br /> D. Described proposed underground work, including reopening of old workings, <br /> advancement of adits or shafts, trenches, pits, cuts, rock dumps, or other types of <br /> disturbance, describe type, quantity and general dimensions: <br /> Underground drilling will occur within the existing level 14 tunnel.Access is from the the level 14 adit. No <br /> diStLIFbanGes. DFiliffing will be an 60' inGFements. Tunnel will be dFilling only, no etheF di6tUFbanGes <br /> WateF fFeFn dF*"*Ag Will be eelleeted ante peFtable tanks at the dFill pad. Ne FnUd pittS FeqUiFed. <br /> Caldera will use water from the Level 14 portal. Water rights are attached in the supplmental pictures. <br /> will be by wattles surrounding the drill rig. Sample pictures on supplemental document. <br /> Form 2-Public File Page 6 of 14 <br />