Laserfiche WebLink
O <br /> O <br /> N <br /> �O <br /> Cf)00 <br /> -0 <br /> rrL^^ <br /> VJ O <br /> (n� p � <br /> E <br /> U <br /> SKID-MOUNTED \ 3 CD <br /> DOUBLE WALL FUEL <br /> STORAGE TANK +`� 7 rn U <br /> CAPACITY = 12,000 GAL <br /> RECEIVED <br /> JUL 19 2023 <br /> 01 ado Division of Reclamatio <br /> SKID-MOUNTED and Saftey <br /> STEEL DOUBLE WALL FUEL Mining <br /> m STORAGE TANK <br /> CAPACITY = 2,000 GAL <br /> a <br /> dap R[ClSl <br /> N <br /> a•°ue <br /> M t�+ <br /> 1 <br /> PLAN VIEW <br /> a f <br /> Lo C( <br /> 12,000 GAL <br /> a STEEL DOUBLE WALL FUEL <br /> STORAGE TANK <br /> 2,000 GAL a m m <br /> STEEL DOUBLE WALL FUEL 4.00' m a o <br /> c U <br /> STORAGE TANK N N N M M) <br /> N [V N N N <br /> iov� � n n <br /> N 0 M N <br /> N <br /> ado ao W P, <br /> N SKID + SKID <br /> N p <br /> U <br /> m U O a a' <br /> N <br /> U <br /> / c C C c <br /> O O O O ? <br /> Mn 'y 'N 'N <br /> I a <br /> SECTION VIEW <br /> Job No. 2019-341.002 m <br /> E Drawn by: RCS <br /> Date: 07/17/2023 <br /> a NQTE; SEE THE SITE-SPECIFIC SPCC FOR MORE DETAILED QC: ABF PE: ABF 2 <br /> o INFORMATION AND NARRATIVE. <br /> File: RiflePit-Details a <br /> Title: <br /> Spill Prevention Control <br /> & Containment (SPCC) <br /> Detail <br /> 01 <br /> K SPILL PREVENTION CONTROL & CONTAINMENT (SPCC) DETAIL Dwg No <br /> N <br /> 13 N.T.S. 13 <br /> N <br /> - Of 16 <br />