My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-07-19_REVISION - M2021052 (11)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2021052
>
2023-07-19_REVISION - M2021052 (11)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2023 8:42:03 PM
Creation date
7/19/2023 3:53:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021052
IBM Index Class Name
Revision
Doc Date
7/19/2023
Doc Name Note
Attachement A - Project Drawings
Doc Name
Adequacy Review Response
From
IHC Scott
To
DRMS
Type & Sequence
AM1
Email Name
ACY
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O <br /> O <br /> CV <br /> O O <br /> +-O <br /> Cn� <br /> NO <br /> � O O <br /> L( U <br /> X C2-CZ:"fn-0 C) -, <br /> N O — E <br /> O 2) <br /> CO O S <br /> �Ur 0, <br /> 7" "'DEIVED <br /> JUL 19 2023 <br /> 0 <br /> �c orado Division of Reclamati n, <br /> Mining and Saftey <br /> U <br /> T SR <br /> m <br /> APPROXIMATE <br /> a FINISHED GRADE <br /> N FURROWS 2" TO 4" DEEP Q` ••°'°''• F� <br /> PARALLEL TO CONTOURS <br /> 0 6" MIN. TOPSOIL C: <br /> LAYER, TYP. —: L36 <br /> ....LAP <br /> Le •�� <br /> o SURFACE ROUGHENING INSTALLATION NOTES <br /> a <br /> 3 1. SURFACE ROUGHENING SHALL BE PROVIDED ON ALL FINISHED <br /> GRADES (SLOPES AND "FLAT" AREAS) WITHIN 2 DAYS OF N N <br /> 'o COMPLETION OF FINISHED GRADE (FOR AREAS NOT RECEIVINGLO <br /> 4_ <br /> o TOPSOIL) OR WITHIN 2 DAYS OF TOPSOIL PLACEMENT. <br /> 2. AREAS WHERE BUILDING FOUNDATIONS, PAVEMENT, OR SOD IS <br /> TO BE PLACED WITHIN 7—DAYS OF FINISHED GRADING DO NOT <br /> i NEED TO BE SURFACE ROUGHENED. a m m <br /> a a J J <br /> m 0 O � <br /> `- 3. DISTURBED SURFACES SHALL BE ROUGHENED USING RIPPING OR N N N <br /> i TILLING EQUIPMENT ON THE CONTOUR OR TRACKING UP AND <br /> DOWN A SLOPE USING EQUIPMENT TREADS. 'Z <br /> N SURFACE ROUGHENING MAINTENANCE NOTES <br /> I <br /> 1. THE SWMP MANAGER SHALL INSPECT THE SURFACE ROUGHENING 0 EACH O7HE <br /> o m U O a- <br /> WEEKLY, DURING AND AFTER ANY STORM EVENT AND MAKE v <br /> j REPAIRS OR CLEAN OUT UPSTREAM SEDIMENT AS NECESSARY. .o <br /> EARTH-SAVERS m E .N N y N - <br /> 3 STRAW WATTLE °' > m > <br /> 0 2. VEHICLES AND EQUIPMENT SHALL GENERALLY BE CONFINED TO <br /> = ACCESS DRIVES AND SHALL NOT BE DRIVEN OVER AREAS THAT GROUND <br /> HAVE BEEN SURFACE ROUGHENED. FLOW <br /> o <br /> 3. IN NON—TURF GRASS FINISHED AREAS, SEEDING AND MULCHING Job No. 2019-341.002 <br /> SHALL TAKE PLACE DIRECTLY OVER SURFACE ROUGHENED AREAS \ = Drawn b : RCS 2 <br /> a WITHOUT FIRST SMOOTHING OUT THE SURFACE. z _� ___ f ,� J% Date: 07/17/2023 <br /> QC: ABF PE: ABFo <br /> 0 / f File: RiflePit-Details a` <br /> 0 4. IN AREAS NOT SEEDED AND MULCHED AFTER SURFACE <br /> ROUGHENING, SURFACES SHALL BE RE—ROUGHENED AS REN Title: <br /> NECESSARY TO MAINTAIN GROOVE DEPTH AND SMOOTH OVER <br /> w ANY RILL EROSION. Erosion Control Details <br /> i <br /> 01) <br /> M <br /> SURFACE ROUGHENING ON STRAW WATTLE Dwg No. <br /> rG FINISHED GRADES rH INSTALLATION 10 <br /> N <br /> N Q N.T.S. l O N.T.S. <br /> i <br /> Of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.