Laserfiche WebLink
Rifle Gravel Pit#1 July 2023 <br /> Phase 4—Final Reclamation �^:��i` 6 months—1 year <br /> • Reclaimed Pond Surface Area=9.70 acres(no cost) GPS labor=$3,750 <br /> • Verify the mining slopes and greenbelt area slopes using GPS(labor included) Other estimated labor=$5,000 <br /> • Reclaim Berm Area(between berm and greenbelt area)=0.70 acres reclaimed with Upland Seed Mix $1,000/acre(seeding,subcontracted labor)_ <br /> • Wetland Area to remain =0.63 acres no cost $700 <br /> Estimated Phase 4 Final Reclamation Costs=$9,450 <br /> Sub-Total $286.166 <br /> DRMS Costs <br /> $80,127 <br /> 28%x direct costs) <br /> Total Bond Amount $366,293 <br /> 76 <br />