Laserfiche WebLink
RECEIVED <br /> Rifle Gravel Pit#1 ;JUL 19 2023 July 2023 <br /> evam—afi-o—n, <br /> Mining and Saftey <br /> 13.0 Exhibit L — Reclamation Costs <br /> Reclamation details are provided in Figure 15, Exhibit F1 and Figure 16, Exhibit F2. The <br /> pond will not be backfilled but will remain as open water. A 6-foot wide 5:1 greenbelt slope <br /> will be constructed on the inner perimeter of the pond, transitioning to 3:1 slope to full depth. <br /> Reclamation costs are also associated with reclamation activities on the perimeter berm, <br /> along with minor anticipated work in the upland buffer between the outer boundary of the <br /> perimeter berm and the property boundary. Volumes, areas, and seeding mixes are <br /> provided in Figure 14, Exhibit E1. Based on these costs, and a 28% DRMS cost factor, the <br /> total bond for the Rifle Gravel Pit will be $366,293. <br /> 74 <br />