Laserfiche WebLink
Rifle Gravel Pit#1 July 2023 <br /> Figure 10. Exhibit C5—Phase 3 60% Mining Map 19 <br /> Figure 11. Exhibit C6—Phase 3 100% Mining Map 20 <br /> Figure 12. Exhibit D1 -Typical Mineral Stratum for the Rifle Pit#1 (See Attachment C for boring data) <br /> 26 <br /> Figure 13. Exhibit D2-Erosion Control Plan (See Attachment A for Erosion Control Details) 27 <br /> Figure 14. Exhibit E1 -Earthwork Quantities and Reclamation Seeding and Planting Information 36 <br /> Figure 15. Exhibit F1. Reclamation Plan Map(with contours) 45 <br /> Figure 16. Exhibit F2. Reclamation Plan Map(without contours,with shading) 46 <br /> Figure 17. Exhibit G -Water Information 48 <br /> Figure 18. Exhibit H1 —Bald Eagle Range 61 <br /> Figure 19. Exhibit H2—Elk Range 62 <br /> Figure 20. Exhibit H3-Mule Deer Range 63 <br /> Figure 21. Exhibit H4—Osprey Range 64 <br /> Figure 22. Exhibit H5—Threatened & Endangered Species Critical Habitats 65 <br /> Figure 23. Exhibit I -Soils Information. 67 <br /> v <br />