My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-07-19_REVISION - M2021052 (17)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2021052
>
2023-07-19_REVISION - M2021052 (17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2023 8:49:47 PM
Creation date
7/19/2023 3:32:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021052
IBM Index Class Name
Revision
Doc Date
7/19/2023
Doc Name Note
Cover Letter
Doc Name
Adequacy Review Response
From
IHC Scott
To
DRMS
Type & Sequence
AM1
Email Name
ACY
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
do not meet the final reclamation configuration (pond) back to rangeland. Topsoil and <br /> overburden may be sold after the completion of final reclamation of the current phase <br /> of the mining operation <br /> a) Please revise both the Mining and Reclamation Plans to include a statement that <br /> sufficient material will be retained until no longer needed for final reclamation. State <br /> the volume by mining phase (Initial strip, 30%, and 60%) required to be replaced. <br /> The narrative has been updated to reflect that the overburden and topsoil <br /> stripped during Phase 1 will be stockpiled until the 60%phase when Scott will <br /> need to sell some of the material in order to mine this area. The anticipated <br /> volumes needed by Phase (Initial Strip is Phase 1) are included in the cost table. <br /> b) Commit to stabilizing all stored topsoil with a temporary mix. <br /> No temporary mixes will be used for this project, as stated in Section 6.3.3.1. <br /> The narrative provides a commitment to stabilize all stored topsoil with the <br /> upland seed mix (minus the shrubs). <br /> c) Include the cost of replacing topsoil and overburden for all affected lands not yet <br /> a pond and reseeding as an upland mix. <br /> Added to the cost table. <br /> 17) With regards to GPS slope verification, is it $3,500 per mining phase plus the <br /> $2,500 one-time set up?Or$3,500 each time they come out and you anticipate needing <br /> services for each mining phase plus once for final reclamation? <br /> There is a one-time set up fee at the beginning of the project. It is anticipated <br /> that is will be an additional $3,500 per mining phase. <br /> 6.4.19 EXHIBIT S - Permanent Man-made Structures <br /> The updated structure agreement for CDOT is not valid. The signature dates and notary <br /> dates for CDOT's portion are different dates and therefore invalid. However, because <br /> this structure is covered under the Geotechnical Stability Analysis a completed <br /> agreement is not necessary. <br /> Sincerely, <br /> IHC SCOTT, INC. <br /> Andy Carpenter <br /> Area Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.