My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-04-19_PERMIT FILE - C1981010 (105)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2023-04-19_PERMIT FILE - C1981010 (105)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2023 11:07:52 AM
Creation date
7/14/2023 11:01:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Permit File
Doc Date
4/19/2023
Doc Name
pgs 4-249 to 4-263
Section_Exhibit Name
4.9 Soils
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 4.9-3 Projected Bank Cubic yards (PBCY) of topsoil to be salvaged and replaced by pit from 2023-2027 and <br />the resultant drawdown or increase of stockpile inventory <br />Acres per year salvaged from Bank Cubic Yards Salvaged @12" (000's) <br />Pit 2023 2024 2025 2026 2027 2023 2024 2025 2026 2027 <br />Ash (Ashmore) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 <br />C Pit 145.5 43.5 0.0 0.0 0.0 234.7 70.2 0.0 0.0 0.0 <br />I/J Pits 45.8 13.5 0.0 0.0 0.0 73.9 21.8 0.0 0.0 0.0 <br />L Pit 30.0 0.0 0.0 0.0 0.0 48.4 0.0 0.0 0.0 0.0 <br />N Pit 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 <br />Other 4.7 0.0 0.0 0.0 0.0 7.6 0.0 0.0 0.0 0.0 <br />Total 226.0 57.0 0.0 0.0 0.0 364.6 92.0 0.0 0.0 0.0 <br />Acres per year Replaced Bank Cubic Yards Replaced @ 12" (000's) <br />Pit 2023 2024 2025 2026 2027 2023 2024 2025 2026 2027 <br />Ash (Ashmore) 36.8 0.0 0.0 0.0 0.0 59.4 0.0 0.0 0.0 0.0 <br />C Pit 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 <br />I/J Pits 128.8 0.0 50.7 31.1 28.4 207.8 0.0 81.8 50.2 45.8 <br />L Pit 70.8 86.4 0.0 133.1 91.4 114.2 139.4 0.0 214.7 147.5 <br />N Pit 0.0 0.0 0.0 94.5 120.4 0.0 0.0 0.0 152.5 194.2 <br />Other 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 <br />Total 236.4 86.4 50.7 258.7 240.2 381.4 139.4 81.8 417.4 387.5 <br />000's BCY's Increase/(Decrease) <br />Pit 2023 2024 2025 2026 2027 Total for Permit Term <br />Ash (Ashmore) (59.4) 0.0 0.0 0.0 0.0 (59.4) <br />C Pit 234.7 70.2 0.0 0.0 0.0 304.9 <br />I/J Pits (133.9) 21.8 (81.8) (50.2) (45.8) (289.9) <br />L Pit (65.8) (139.4) 0.0 (214.7) (147.5) (567.4) <br />N Pit 0.0 0.0 0.0 (152.5) (194.2) (346.7) <br />Other 7.6 0.0 0.0 0.0 0.0 8 <br />Total (16.8) (47.4) (81.8) (417.4) (387.5) (950.9)4-261
The URL can be used to link to this page
Your browser does not support the video tag.