Laserfiche WebLink
[T4-8-11] 7/22 4-240 <br />Table 4.8-11. Operational Surface Water Monitoring Schedule. <br /> <br /> Twice <br /> Monthly Quarterly Monthly <br /> Sampling Sampling Sampling <br />NPDES Require- Require- Require- <br />Site Gulch ment ment ment Comments <br /> <br />001 Johnson List A-1 List A-4 NA Baseline site name S-14. <br />002 No Name List A-1 List A-4 NA Baseline site name S-5. <br />005 Coyote (2) NA NA List A-4 Baseline site name S-11. <br />006 West Buzzard List A-1 List A-4 NA Pending WQCD approval. <br />008 Ute NA NA NA Baseline site name S-15. <br />009 Middle Pyeatt (2) NA NA List A-4 <br />011 East Pyeatt List A-1 List A-4 NA Baseline site name S-3. <br />013 West Pyeatt List A-1 List A-4 NA <br />014 East Buzzard List A-1 List A-4 NA Pending WQCD approval. <br />015 Grouse NA NA NA <br />016 Sage NA NA NA <br />017 Oak List A-1 List A-4 NA <br />018 Horse List A-1 List A-4 NA <br />019 West Flume List A-1 List A-4 NA <br />020 Middle Flume List A-1 List A-4 NA Baseline site name S-1. <br />021 E. Middle Flume List A-1 List A-4 NA <br />022 Deal List A-1 List A-4 NA <br />023 East Flume (2) NA NA List A-4 <br />024 West Horse NA NA NA <br />025 Deacon List A-1 List A-4 NA <br />026 Deal #2 List A-1 List A-4 NA <br />027 Jeffway #1 List A-1 List A-4 NA <br /> <br /> <br />(1) Once the drainage is disturbed, appropriate monthly and quarterly sampling will commence. <br />(2) Quarterly WET Testing required <br /> <br />Note: See Table 4.8-12 for parameters list.