My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-07-13_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2023-07-13_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2023 10:34:04 AM
Creation date
7/14/2023 7:29:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
7/13/2023
Doc Name
Application
From
Tony Tennyson -Tri-State Generation and Transmission Association, Inc.
To
DRMS
Type & Sequence
SL22
Email Name
ZTT
AME
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colowyo Coal Company L.P. <br /> III. Phase II Areas Summary of Reclamation and Management <br /> A. General Description <br /> As shown on Map 1, each area requested for bond release is comprised of smaller units, which <br /> correspond to the specific year that backfilling, grading and reseeding were performed. The <br /> work completed includes regrading to the approved post-mining topography, topsoil <br /> replacement, and seeding with the approved seed mix. Grading and topsoil replacement was <br /> generally performed in the summer and fall months with seeding occurred in the fall. The <br /> following table presents when each reclamation parcel was regraded, topsoiled, and seeded. <br /> Reclamation Total Acres Regraded Topsoiled Seeded <br /> Unit (Year) (Year) (Year) <br /> EP061 14.5 2018 2018 2018 <br /> WP026 50.2 2018 2018 2018 <br /> WP027 17.2 2018 2018 2018 <br /> WP028 17.8 2018 2018 2018 <br /> WP029 38.2 2018 2018 2018 <br /> WP032 10.5 2015 2015 2015 <br /> Phase I bond release has been granted on all parcels being applied for Phase II. It should be <br /> noted that acreages applied for Phase II bond release may not correspond to topsoil and seeded <br /> acreages presented in annual reclamation reports. <br /> B. Topsoil Replacement <br /> Topsoil application depths are taken as soon as topsoil is replaced on a given reclamation unit. <br /> Colowyo presents replacement topsoil depths in the annual reclamation report to the Division. <br /> For topsoil replace depths pertaining to the reclamation units applied for bond release under this <br /> application please refer to annual reclamation report as follows: <br /> SL-22 Phase II Bond Release Application <br />
The URL can be used to link to this page
Your browser does not support the video tag.