Laserfiche WebLink
Groundwater Monitoring Plan <br /> 3.0 REPORTING <br /> Groundwater monitoring data will be presented in a table including the sampling date, <br /> parameter results with graphs and/or plots for selected parameters, and a comparison <br /> to predictions and to the groundwater quality standards. The parameters that exceed <br /> the Table Value Standard on the Sampling Parameter List will be highlighted with bold <br /> or colored fonts in the report. The groundwater quality data report will include a <br /> narrative analysis of the data and identify trends and anomalies. <br /> It is proposed that control charts, generated on a quarterly basis (for the baseline <br /> period, then annually after that), be provided to the Division on an annual basis to <br /> demonstrate changes in water quality with time. If exceedances of the control charts are <br /> noted after regular annual sampling, a specific response plan will be prepared by LGE <br /> to address that issue. The specific response plan would be based on an evaluation of <br /> the number of selected parameters that show exceedances and the duration of these <br /> exceedances. <br /> 4.0 VERIFICATION RE-SAMPLING <br /> Under certain circumstances a verification re-sampling may be collected, and samples <br /> submitted for analysis using the Groundwater Sampling Plan. The samples will be <br /> collected within four weeks of the analytical report date. A verification sample may be <br /> collected during the following sampling event depending on the frequency of sampling. <br /> Verification re-samples are designed to provide confirmation of the sample analytical <br /> data for sample result anomalies or statistical analysis. <br /> FgAj MOLEN LG Everist Monitoring Plan <br /> Page 5 of 5 <br />