Laserfiche WebLink
ENVIRONMENT, INC. PAGE 5 <br /> L.G. EVERIST, INC.-WEST FARM RESERVOIR ADEQUACY RESPONSE 02 <br /> JURY 10,2023 <br /> lowest numerical standard for that analyte in those tables. Justification must be <br /> provided for removing any analytes from the baseline sampling program. DRMS <br /> certainly does not object to the collection of additional parameters(such as alkalinity, <br /> calcium, magnesium,potassium and sodium as included in Table 3) which may be <br /> useful for the purposes of groundwater chemistry. <br /> Responses to points 22a thru 22n have been addresses in the revised Groundwater Sampling <br /> Plan (GSP) and the Groundwater Monitoring Plans . Copy attached. <br /> A revised Map Exhibit 61 - Water Wells within 200 ft. making the well designations <br /> uniform is attached. <br /> 23a) Based on the information provided in the Groundwater Elevation Model, and the <br /> shallow pre-mining depth to groundwater(less than 5'b.g.s. in MW7), DRMS will <br /> require the installation of an underdrain as depicted in Figure 5 of the Groundwater <br /> Elevation Model along the southeast area of the permit to maintain the prevailing <br /> groundwater levels in this area. Please provide detailed design/installation <br /> specifications for this underdrain and a commitment to install the underdrain in <br /> conjunction with the slurry wall installation for Cell 1. <br /> L.G. Everist will commitment to installing the under drain in conjunction with the slurry wall <br /> installation for the Phase 1 reservoir from the base of the terrace to the east along the <br /> southeast side. The approximate location of the under drain is shown on the Exhibit F - <br /> Reclamation Plan Map revised 7-06-2023. It is premature to actually provided the design <br /> and installation specifications until the exact location of the slurry wall will be known . The <br /> design information will be provided as a Technical Revision prior to installation of the under drian. <br /> In general the plan is to use a 12 inch diameter perforated PVC pipe that will be placed along <br /> the outside of the slurry wall at an elevation consistent with the average historic <br /> groundwater elevation along the south side of the proposed slurry wall. The pipe will be <br /> surrounded with gravel bedding and then covered with native backf ill. The pipe will be <br /> sloped so it drains to the east and either empties into the river or the irrigation return flow <br /> ditch that will run north along the east side of the Phase 1 slurry wall, emptying into the <br /> river. <br /> 24a) DRMS concurs with the placement of the additional groundwater monitoring wells <br /> shown in Exhibit G, and the Groundwater Quality Monitoring Plan. Please commit to <br /> providing well construction diagrams for all currently installed wells, and proposed <br /> wells upon installation. <br /> A Typical Monitoring Well diagram for the existing monitoring wells is attached. L.G. <br /> Everist will commit to providing well construction diagrams for the proposed monitoring <br /> wells when they are installed. <br />