Laserfiche WebLink
MINING PLAN AND TIMETABLE EXHIBIT D(CONT) <br /> area will include stripped, partially mined, partially reclaimed, <br /> the Plant Site area, materials stockpile area, settling pond fa- <br /> cility and the slurry wall around future reservoir areas . As <br /> mining progresses across the property some parts of the property <br /> will remain undisturbed while other areas will be either <br /> stripped, mined, partially reclaimed or totally reclaimed. The <br /> EXHIBIT C-1 -MINING PLAN MAP provides information of how the Phases will <br /> develop during mining. Initially the 205 acres would include <br /> having stripped and partially mined Phase 1, the 50 acre Plant <br /> Site and installed the slurry wall around Phase 1 and the instal- <br /> lation of the under drain along the southeast section of the <br /> phase . Much of the 205 acres would be within the highwater line <br /> of the reservoirs that would be covered with water and would need <br /> no soiling or revegetation. This amount of disturbance may change <br /> as the mine develops but prior to exceeding the initial 205 <br /> acres, a Technical Revision will be filed to increase the bond <br /> and allow for more disturbance and address the design of the un- <br /> der drain. <br /> This map shows the estimated location of the final slopes <br /> around the perimeter of the entire areas to be mined. The esti- <br /> mated reservoir highwater line, bank areas to be armored, the top <br /> of mining slope and slurry wall locations are shown. It also <br /> shows the maximum working face (highwall) for each Phase and the <br /> estimated cut/fill volume per foot to grade the working face <br /> highwall back to 3h to 1v. No more than 1000 feet of total per- <br /> manent bank sloping will be needed (500 ' on each side of <br /> highwall) . The volume to complete the backfilling on the exte- <br /> rior slopes is shown. In Phase 2 this volume will be greater <br /> because any area mined within 300 feet of the river bank will be <br /> backfilled so a 300 foot setback can be maintained when the res- <br /> ervoirs are built . This river bank excavation area will be done <br /> in 500 feet or less section that will not be left open for more <br /> the 12 months before backfilling, sloping and armoring begins in <br /> any given section. <br /> Of the 472 . 40 acres ± in the permit area, approximately <br /> 385 . 79 acres ± will be disturbed by mining. Within the disturbed <br /> area 356. 92 acres will be mined. The 28 . 87 acres of unmined area <br /> will be the setback margins between the slurry wall and the top <br /> of slope into the reservoirs . This area will contain roads for <br /> access to the reservoir areas during and after mining. EXHIBIT F- <br /> RECLAMATION PLAN MAP shows how the reservoirs will be developed. <br /> As mining progresses a reservoir area will be sold and a <br /> L.G. EVERIST, INC-WEST FARM RESERVOIRS July 2023 <br /> 10 <br />