Laserfiche WebLink
(e) Mining Timetable <br /> As mining is already being conducted under the approved 110c permit, it shall proceed in the same <br /> direction under the 112c permit.The primary location of the approved 110c permit is located at the <br /> northernmost area of the property,encompassing 8.1 acres,while the remaining 1.7 acres under the <br /> permit is located at the southernmost end of the property. Physical mining of the material is proceeding <br /> in a southerly direction. Fine material most in demand, as described in Exhibit D,Subsection D, is in <br /> decline near the northern permit boundary.Coarser material is still prevalent in the area.As fine <br /> material is removed and below grade depth is increased, mining distance from permit boundary is <br /> increased.This enables easier backfill and grading for reclamation purposes. <br /> The following table is an estimation of the amount of acreage increase per year. Points of the table <br /> correspond with maps also included. <br /> Date Acre Point A Point B Point C Point D Point E <br /> Increase <br /> 2023 4�' <br /> 2024 F3.30 <br /> - 16.55 acres <br /> 2025 <br /> 2026 - - - 22.8 acres <br /> 2027 f` <br />