Laserfiche WebLink
E. Other Disturbances (please describe) <br /> None <br /> F. Indicate Chemicals and Fuels used or stored on site. List type, quantity and method to <br /> store. <br /> Drilling muds, hole abandonment material (bentonite and cement) and loss circulation <br /> materials. No diesel will be stuied uri-site, it will be. hanspoited hain earion City in a <br /> CDOT certified vehicle and will remain in that vehicle and pumped into the drill rig as <br /> required. There will be small quantities of drilling and engine oil, grease and other fluids <br /> used to =int2iM GAM0 aqwipmant 2-s- no @ dad; they wil 1 bea st a-re d- appropriately a-nsite <br /> G. New Roads: <br /> Length (ft): 1500 Width (ft): 12 <br /> Significantly <br /> Upgraded Roads Length (ft): Width (ft): <br /> Are culverts or other crossings proposed? If so,please describe: <br /> No. unlikely to be necessary. Some already in place on private and public access roads <br /> H. Total project area to be disturbed (acres) 1.5 acres (if all holes drilled) <br /> I. Describe the equipment to be used for the prospecting operations: <br /> Surface air/mud rotary drill rig and/or diamond core drill rig as well as ancillary air <br /> cumplessur(s), water truck, pipe truck, backhae, gradei, buildozei, backhoe , se d , <br /> pick-up truck(s), light plant(s), small generator(s), haul truck for delivering / removing <br /> off-road equipment <br /> Form 2-Public File Page 7 of 14 <br />