My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-07-05_REVISION - P2021019
DRMS
>
Day Forward
>
Revision
>
Prospect
>
P2021019
>
2023-07-05_REVISION - P2021019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2023 8:34:38 PM
Creation date
7/6/2023 10:43:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2021019
IBM Index Class Name
Revision
Doc Date
7/5/2023
Doc Name
Request For Modification
From
EAI
To
DRMS
Type & Sequence
MD1
Email Name
TC1
MAC
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and <br /> redistributed for the re-establishment of vegetation. Specify approximate topsoil <br /> redistribution depth: <br /> Topsoil in the NOI area is estimated to be 40-60 cm thick. <br /> if leveling of pads is necessary topsoil will be stockpiled for <br /> replacement during reclamation to ensure re-establishment of vegetation. <br /> One of the ranch owners will most likely be responsible for the reclamation. <br /> 4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required <br /> abandonment procedures): <br /> Each drill hole will be abandoned in accordance with rule 5.4.2. As all drillholes are expected to <br /> described by the Colorado State Mineral Rules and Regulations Rule 5. We will cement <br /> e bottom o ot each hole or to the top ot the mineralized geological units which ever Is <br /> of greater thickness. Above the cemented portion "Baroid Shur-gel" or equivalent bentonite <br /> material design for bore hole abandonment, will be inserted and filled the remaining <br /> volt n ;ijrfarp cap of cement well ha i la(-Pd in the hula to a depth of 5 4n feet Each <br /> cement cap will be accompanied by metal washer. The washer will be stamped with the <br /> 5. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be <br /> reclaimed (refer to Rule 3 and Rule 5 for specific reclamation performance standards). <br /> You may wish to contact the Division for closure specifications. <br /> N/A <br /> Form 2—Public File Page 9 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.