My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-07-05_PERMIT FILE - P2023015
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2023015
>
2023-07-05_PERMIT FILE - P2023015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2023 8:31:34 PM
Creation date
7/6/2023 10:38:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2023015
IBM Index Class Name
Permit File
Doc Date
7/5/2023
Doc Name
Notice Of Intent
From
EAI
To
DRMS
Email Name
TC1
MAC
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and <br /> redistributed for the re-establishment of vegetation. Specify approximate topsoil <br /> redistribution depth: <br /> Native topsoil ranges in depth from less than one inch to eight inches. When an area is <br /> leveled, e topsoil will e stockpiled within the tootprint ot the drill pad or road access. <br /> The topsoil will be replaced upon completion of drilling and commencement of <br /> reclamation. <br /> 4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required <br /> abandonment procedures): <br /> Drill holes will be immediately abandoned upon completion of extracting core and <br /> collecting clata. Abandonment reports will e submitted to the Uivision within 12 <br /> months of abandonment. Holes will be abandoned in accordance with Rule 5.4.2. <br /> Water producing zones will be sealed according to Division regulations. Cement will be <br /> 0 <br /> is greater thickness. Bentonite will be used above the cemented portion to fill the <br /> remaining depth. A surface cap will be placed with a metal washer that is stamped with <br /> the ",ele Turnber. <br /> S. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be <br /> reclaimed (refer to Rule 3 and Rule 5 for specific reclamation performance standards). <br /> You may wish to contact the Division for closure specifications. <br /> Sumps will be allowed to drain and the cuttings will be covered and mixed with the <br /> material a was excavated o build the sump. I he area will e compacted an <br /> prepared for final reclamation by re In acing the salvaged topsoil. Final seeding will be <br /> done in the Fall. <br /> Form 2—Public File Page 9 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.