My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-07-05_REVISION - M2021052
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2021052
>
2023-07-05_REVISION - M2021052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2023 8:41:55 PM
Creation date
7/6/2023 8:32:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021052
IBM Index Class Name
Revision
Doc Date
7/5/2023
Doc Name Note
Adequacy Review #5
Doc Name
Adequacy Review
From
IHC Scott
To
DRMS
Type & Sequence
AM1
Email Name
ACY
THM
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
402
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
updated to clarify where the topsoil, seeding, and reclamation activities will occur throughout <br /> the mining operations, including estimated areas and volumes. <br /> 4. How will the Operator ensure that slopes are reclaimed to the proper grade if they <br /> cannot be visually inspected, per Rule 3.1.5(7)?Adequacy Review#4 Response#31 was <br /> sufficient. Please include grading verification explanation within the narrative portions <br /> of Mining and Reclamation Plans. <br /> The narrative in Section 5.2.8 has been updated to reflect the response given for question#31 <br /> in Adequacy Review#4. Note this narrative has also been included in the Phase 3 mining <br /> narrative to reflect the reclamation of the greenbelt fringe as mining proceeds from the 30% <br /> to 100%conditions. <br /> 5. Figure 14, Exhibit E1 depicts topsoil removal from all affected lands, but the narrative <br /> section 5.2.1.1 states that only 11.18 acres will be stripped. Explicitly state within the <br /> mine plan the number of acres that topsoil will be stripped from. Clarify and <br /> consistently present information across exhibits. <br /> Exhibit E1 has been updated to clarify where the topsoil,seeding, and reclamation activities <br /> will occur throughout the mining operations, including estimated areas and volumes. <br /> 6.4.5 EXHIBIT E -Reclamation Plan <br /> 6. Adequacy Review#4, Response#38 is incorrect. Several maps depict a piezometer <br /> within the affected lands boundary on the east side of the affected lands, within the <br /> permit boundary. Clarify if this is a permanent feature or provide reclamation details <br /> within Exhibit E and an associated cost provided under Exhibit L- Reclamation Cost <br /> Estimate. <br /> This piezometer will be removed as part of the mining activities and not remain as a <br /> permanent feature. <br /> 7. Pursuant to Rule 3.1.5(7) slopes shall be no steeper than a 3H: 1V, 5 feet above the <br /> water and 10 feet below the expected water line. Within the narrative portion of the <br /> Reclamation Plan, explain how slope grades will be verified when inundated. Also see <br /> question#4. <br /> The narrative in Section 5.2.8 has been updated to reflect the response given for question#31 <br /> in Adequacy Review#4. Note this narrative has also been included in the Phase 3 mining <br /> narrative to reflect the reclamation of the greenbelt fringe as mining proceeds from the 30% <br /> to 100%conditions. <br /> 8. Please commit to providing the Division with slope configuration data as part of the <br /> annual report. OR include a reclamation task item to verify sloping at the end of mining. <br />
The URL can be used to link to this page
Your browser does not support the video tag.