My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-07-05_HYDROLOGY - M2006078
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2006078
>
2023-07-05_HYDROLOGY - M2006078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2023 2:19:08 PM
Creation date
7/5/2023 2:09:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006078
IBM Index Class Name
Hydrology
Doc Date
7/5/2023
Doc Name
Substitute Water Supply Plan
From
Division of Water Resources
To
DRMS
Email Name
PSH
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2009-2023 Camenish Borrow Pit SWSP, Applegate Group, Inc. Page 3 of 5 <br /> July 5, 2023 <br /> (depletions starting in February 2009) and those out-of-priority lagged depletions that will accrue <br /> to the stream during this plan period. <br /> 2. Well permit no. 65445-F was issued in accordance with section 37-90-137(2) and (11), C.R.S. The <br /> Applicant shall request that permit no. 65445-F be canceled since the site has been lined. <br /> 3. Approval of this SWSP is for the purpose stated herein, specifically to provide replacements for <br /> lagged depletions due to mining. This SWSP does not permit any future groundwater exposure, <br /> water use for dust control, aggregate production, or any other purpose. Any additional uses of this <br /> water must first be approved by this office. <br /> 4. All releases of replacement water must be sufficient to cover all out-of-priority depletions in time, <br /> place, and amount. The release of monthly replacement water may be aggregated in a single <br /> release to maximize beneficial use at the direction and approval of the Water Commissioner. <br /> 5. Conveyance loss for delivery of augmentation water to the South Platte River is subject to <br /> assessment and modification as determined by the Division Engineer. <br /> 6. The Applicant shall provide daily accounting from this date forward and monthly accounting for <br /> months past (including, but not limited to total water used, depletions including evaporative losses, <br /> replacement sources, the quantity of replacement water provided starting July 1, 2016, and river <br /> calls), submitted on a monthly basis. The accounting must be uploaded to the CDSS Online Reporting <br /> Tool within 30 days of the end of the month for which the accounting applies <br /> (https://dwr.state.co.us/Tools/reporting). Instructions for using the tool are available on the <br /> Division of Water Resources website on the "Services" —> "Data Et Information" page under the <br /> heading of Online Data Submittal. Accounting and reporting procedures are subject to approval and <br /> modification by the Division Engineer. Accounting forms need to identify the WDID number for each <br /> structure operating under this SWSP. Additional information regarding accounting requirements can <br /> be found in the attached Augmentation Plan Accounting Protocol. NOTE: Monthly accounting, even <br /> during the winter non-irrigation season, is required. <br /> In addition, the Applicant shall verify that the entity making replacements has identified the <br /> Applicant's use specifically on the entity's accounting submitted to this office, and shall claim credit <br /> only for actual amounts released as shown in the entity's accounting. For the period of this plan, <br /> that entity is the Denver Julesburg Water Resource. <br /> 7. The name, address, and phone number of a contact person who will be responsible for the operation <br /> and accounting of this plan must be provided on the accounting forms to the Division Engineer and <br /> Water Commissioner. <br /> 8. Applicant must follow the Augmentation Plan Accounting as referenced in the attached document, <br /> for the operation of this SWSP. <br /> 9. In order to prevent injury to other water rights, the Division Engineer and Water Commissioner must <br /> be able to administer Applicants' replacement water past headgates on the river at times when <br /> those headgates would otherwise be legally entitled to divert all available flow in or "sweep" the <br /> South Platte or its tributaries. Applicant shall not receive credit for replacement of depletions to <br /> the South Platte below such diversion structures unless bypass and measurement structures are in <br /> place to allow the Division Engineer and Water Commissioner to confirm that Applicant's <br /> replacement water is delivered past the headgates. In the event that delivery past dry-up points <br /> requires the use of a structure for which a carriage or use agreement with a third party is required, <br /> Applicant shall be responsible for securing such agreement. Until such time as the Applicant <br />
The URL can be used to link to this page
Your browser does not support the video tag.