Laserfiche WebLink
<br />Page 4 of 4 <br /> <br />maximum acreage proposed for each phase of the operation within the permit area must be specified. <br /> <br />This is a violation of C.R.S. 34-33-111(1)(a) & (e). <br /> <br /> <br /> <br /> <br /> <br /> <br />STEPS NECESSARY TO ABATE VIOLATION (REMEDIAL ACTION): <br /> <br />Abatement Step # Description <br />1 Submit and receive approval of a technical revision to revise the mining and reclamation plans <br />to cover the unapproved disturbed land. <br /> <br /> <br />TIME FOR ABATEMENT (NOT MORE THAN 90 DAYS): <br />ON OR BEFORE last abatement due date <br />Abatement Step # Due Date <br />1 August 11, 2023 <br />