My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-06-26_REVISION - M1978332
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1978332
>
2023-06-26_REVISION - M1978332
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2023 10:51:51 AM
Creation date
6/26/2023 10:22:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978332
IBM Index Class Name
Revision
Doc Date
6/26/2023
Doc Name
Notice of Surety Increase
From
DRMS
To
Gary Kay - Colorado Rose Red Inc.
Type & Sequence
SI1
Email Name
JPL
JLE
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: <br /> Site: Colorado Rose Red Pit Permit Action: Insp 2023 Permit/Job#: M1978332 <br /> PROJECT IDENTIFICATION <br /> Task#: 000 State: Colorado Abbreviation: None <br /> Date: 6/8/2023 County: Larimer Filename: M332-000 <br /> User: JPL <br /> Agency or organization name: DRMS <br /> TASK LIST (DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> 001 Backfill Room#1 and#2 Opening MINESEAL 1 40.00 $8,091 <br /> 002 Grade and shape parking areas LOADER 1 2.34 $300 <br /> 003 Spread Soil Over Bench Areas LOADER 1 6.57 $842 <br /> 004 Reve etation REVEGE 1 2.00 $1,253 <br /> 005 Mobilization MOBILIZE 1 4.36 $1,298 <br /> SUBTOTALS: 55.27 $11,784 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $238 <br /> Performance bond: 1.05 Total= $124 <br /> Job superintendent: 27.63 Total= $2,076 <br /> Profit: 10.00 Total= $1,178 <br /> TOTAL O&P= $3,616 <br /> CONTRACT AMOUNT(direct+O&P)= $15,400 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $500 Total= $500 <br /> Engineering work and/or contract/bid preparation: 4.25 Total= $655 <br /> Reclamation management and/or administration: 5.00 $770 <br /> CONTINGENCY: 0.00 Total= $0 <br /> TOTAL INDIRECT COST= $5,541 <br /> TOTAL BOND AMOUNT(direct+indirect)= $17,325 <br />
The URL can be used to link to this page
Your browser does not support the video tag.