My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-06-26_REVISION - M1978332
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1978332
>
2023-06-26_REVISION - M1978332
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2023 10:51:51 AM
Creation date
6/26/2023 10:22:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978332
IBM Index Class Name
Revision
Doc Date
6/26/2023
Doc Name
Notice of Surety Increase
From
DRMS
To
Gary Kay - Colorado Rose Red Inc.
Type & Sequence
SI1
Email Name
JPL
JLE
SMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br /> EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> Task description: Mobilization <br /> Site: Colorado Rose Red Pit Permit Action: Insp 2023 Permit/Job#: M1978332 <br /> PROJECT IDENTIFICATION <br /> Task#: 005 State: Colorado Abbreviation: None <br /> Date: 6/8/2023 County: Larimer Filename: 005 <br /> User: JPL <br /> Agency or organization name: DRMS <br /> EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per day <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR,6X4,DIESEL POWERED, <br /> 400 HP(2ND HALF,2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK,DROP DECK EQUIPMENT <br /> TRAILER(25T, 50T,AND 100T) <br /> Cost Breakdown: <br /> Available Rig Capacities 0-25 Tons 26-50 Tons 51+Tons <br /> Ownership Cost/Hour: $15.25 $23.06 $37.58 <br /> Operating Cost/Hour: $25.26 $30.83 $51.41 <br /> Operator Cost/Hour: $27.71 $27.71 $27.71 <br /> Helper Cost/Hour: $0.00 $20.22 $20.22 <br /> Total Unit Cost/Hour: $68.22 $101.82 $136.92 <br /> NON ROADABLE EQUIPMENT: <br /> Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br /> Description Unit Cost/hr/unit Cost/hr/uni Size Cost/hr/ Cost/hr/fleet Cost/fleet <br /> (TONS) t fleet <br /> CAT 966H 25.80 $49.15 $68.22 1 $117.37 $68.22 $250.00 <br /> Subtotals: I $117.37 $68.22 $250.00 <br /> ROADABLE EQUIPMENT: <br /> Machine Description Total Cost/hr/ Fleet Size Haul Trip Return Trip <br /> unit Cost/hr/fleet Cost/hr/fleet <br /> Light Duty Pickup,4x4,1 T. $52.53 2 $105.06 $105.06 <br /> Crew <br /> Fuel Tanker,6x4,210 HP $87.21 1 $87.21 $87.21 <br /> Subtotals: $192.27 S192.27 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.