Laserfiche WebLink
Other Reclamation Permits held by Prospective Successor(if applicable): <br /> M2016009, M 1979103, M 1977196, M 1997071, M 1984101, M 1990144, M 1988093, <br /> M2019005, M 1981279, M 1985008, M 1980224, M 1977197, M2021044, M2000151, <br /> M ,-W 442,M213053,M200r7006;-K2Q#4025----- <br /> DESIGNATION OF REVIEW TIMELINE <br /> As explained above,the Permittee and Prospective Successor may waive their right to receive a <br /> decision on an Application within 30 days in order to allow the Division to calculate the required <br /> Finar� Warranty before issuing its decision. germittee and Prospective Successor must initial <br /> one of the f lowing two options tocjZsignate their choice. If Permittee and Prospective <br /> Success cannot agree,the ivi ' n will rend r decision within 30 days. <br /> ave reviewed the information provided in this Application <br /> i ee� Packet, as well as the applicable Act and Rules. Having been fully <br /> informed, I wish to WAIVE MY RIGHT TO A DECISION ON <br /> PW WeP pective Succes,4P MY APPLICATION WITHIN 30 DAYS. <br /> I have reviewed the information provided in this Application <br /> Permittee Packet, as well as the applicable Act and Rules. Having been fully <br /> informed, I wish to MAINTAIN MY RIGHT TO A DECISION <br /> Prospective Successor ON MY APPLICATION WITHIN 30 DAYS. <br /> The Prospective Successor must provide an adequate Financial Warranty or conditional <br /> replacement Financial Warranty, consistent with the designation above. Hard Rock and <br /> Construction Materials Rule 4.3 describes the various acceptable types of Financial Warranties. <br /> Each Financial Warranty must be submitted on the Board's approved forms (available online at <br /> httn://m ining.state.co.us/M ineral%2OForins.htm). <br /> -6- <br />