Laserfiche WebLink
<br /> <br />NOTICE <br />Consideration of Construction Materials Reclamation Permit <br />Amendment Application <br /> <br />DATE: June 15, 2023 <br /> <br />TO: Tom Parko <br />City Planner <br />City of Fort Lupton <br />130 S. McKinley Avenue <br />Box 148 <br />Fort Lupton, CO 80621 <br /> <br />FROM: Peter S. Hays <br /> <br />RE: Wattenberg Lakes - File No. M-2004-051, Holcim - WCR, Inc. <br /> Amendment Application (AM-1) <br /> Request to increase the affected land boundary from 245.0 to 251.2 acres, an increase of <br />6.2 acres. <br /> <br />Please be advised that on June 15, 2023, Holcim - WCR, Inc., whose address and telephone number are <br />1687 Cole Blvd., Suite 300, Golden, CO 80401; (303) 985-1070, filed an application for a/an Amendment <br />(AM- 1) to M2004051, Wattenberg Lakes, which is located approximately 1 miles of Brighton, Section 25, <br />Township 1N, Range 67W, 06th Principle Meridian, in Weld County. <br /> <br />Amendment Application to increase the affected land boundary from 245.0 to 251.2 acres, an increase of 6.2 <br />acres and reconfigure the final reservoir design by combining Pond 1 and Pond 2 into one (1) reservoir. <br /> <br />The application decision is scheduled for September 13, 2023. Written comments or objections to the <br />application may be submitted to and additional information obtained from Peter S. Hays at the Division of <br />Reclamation, Mining and Safety, 1313 Sherman St. Room 215 Denver, CO 80203, by telephone at (303) <br />866-3567 x 8124. <br /> <br />Holcim - WCR, Inc. is required to publish a public notice in a newspaper of general circulation in the locality <br />of the mining operation once per week for four consecutive weeks. If you wish to make comments on or <br />objections to the mine plan and/or the reclamation plan, they must be submitted within twenty (20) days of <br />the date of the last newspaper public notice to be considered in the application review process by the <br />Division. You should contact the applicant for the newspaper publication date. If we do not receive your <br />comments or any objection by the end of the public comment period, the Division will assume you have no <br />objection or comment to the proposed activity. <br /> <br />M-GR-03A-P