My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-04-19_PERMIT FILE - C1981010A (38)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2023-04-19_PERMIT FILE - C1981010A (38)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2024 7:45:04 AM
Creation date
6/13/2023 1:38:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
4/19/2023
Section_Exhibit Name
1.0 Introduction
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Map M10B illustrates topsoil removal and replacement activities for each year of the permit <br />term, including the worst-case year of 2023. This map is the basis for pit disturbance areas. <br />The industrial complex area, and other topsoil replacement areas were calculated from mine <br />workings maps. <br /> <br />A topsoil replacement area for roadways was calculated for roadways lengths as shown on <br />Map M9 and roadway disturbance widths. <br /> <br />For each of the topsoil replacement areas, a typical spread point location was established <br />from which average haul distances and grades were determined based upon their locations <br /> <br /> <br />and the permanent stockpile locations. Table A-10 summarizes the results of each haul <br />route. TALPAC software was used to calculate production rates. The total amount of <br />topsoil required to replace all disturbance during worst case bond year 2023 is 3,671,312 <br />cubic yards. Output from TALPAC is included in Appendix A. <br /> <br />Map M6, Bond Worst Case Year, 2023, shows the disturbed area, topsoil pile locations, the <br />location of final cuts, and regrade cross-section locations. <br /> <br />1.4.3 Facilities Removal <br /> <br />The estimate for the cost of facilities removal is presented in Table A-12 of Appendix A. <br />This estimate was generated by applying unit costs for demolition work, as referenced in <br />bond calculations generated by DRMS. The major demolition costs are associated with the <br />buildings. These estimates are broken out to reflect structure demolition, concrete removal <br />both for flatwork and footings, and material disposal. <br /> <br />The costs for miscellaneous items were generated by applying unit costs supplied by DRMS’ <br />RN8 bond calculation. <br /> <br />The operation of the industrial waste pond is described in Section 4.3.2.2 and is not <br />expected to require more than a minimal effort at the time of reclamation. <br /> <br />1.4.4 Revegetation <br /> <br />All Areas where topsoil had been placed back over disturbed ground would require the <br />establishment of permanent vegetation in order to prevent erosion and make the land <br />productive as either cropland or rangeland (refer to Section 3.6). Table A-11 summarizes <br />the calculation of a total revegetation cost for each post-mining land use by areas as based <br />upon total estimated costs per acre and the number of affected acres. <br /> <br />The costs per acre are detailed in the PR11 bond calculation according to equipment <br />production costs, material costs, and estimated operating rates for each land use. The <br />equipment costs were based on equipment types selected by DRMS, which are similar to <br />the equipment presently being utilized at Trapper Mine for reclamation work. <br /> <br />1.4.5 Miscellaneous Costs <br /> <br />Various miscellaneous costs are addressed in Appendix A. A summary of these costs is <br />shown in Table A-13. <br /> <br /> <br /> <br />1-36
The URL can be used to link to this page
Your browser does not support the video tag.