Laserfiche WebLink
The performance of the West Buzzard sediment control system,as modeled, meets the requirements of <br /> the Regulations of The Colorado Mined Land Reclamation Board for Coal Mining, Section 4.05 <br /> The following supporting documentation is included with this submittal: <br /> • Map M51,Sheet 1, Drainage and Sediment Control Plan <br /> • West Buzzard Pond System SEDCAD Results <br /> • West Buzzard Worst Case SEDCAD Inputs <br /> • Impoundment SEDCAD reports for a 10-year, 24-hour rainfall event <br /> • Impoundment SEDCAD reports for a 25-year, 24-hour rainfall event <br /> • West Buzzard #3 Embankment and Spillway Configuration and Stage Storage <br /> • West Buzzard #4 Embankment and Spillway Configuration and Stage Storage <br /> ENGINEER'S CERTIFICATION <br /> I,James M. Mattern,a Registered Professional Engineer in the State of Colorado,certify that I am <br /> familiar with the Trapper Mine drainage and sediment control plan and,to the best of my knowledge <br /> and information,the results shown on the attached documents are true and correct. <br /> Cc <br /> U •� A , <br /> James M. Mattern 'dam . _`� Date <br /> CO P.E. No. 20537 oFFSS pNAI.��� <br />