Laserfiche WebLink
SEDCAD 4 for Windows <br /> f-inht 1oaA AMA Pamela I SrMmh <br /> Spillway Elev Crest Length Left Right Bottom <br /> (ft) Sideslope Sideslope Width(ft) <br /> 6,220.00 35.00 2.00:1 2.00:1 5.00 <br /> Pond Results: <br /> Peak Elevation: 6,220.84 ft <br /> H'graph Detention Time: 0.27 hrs <br /> Pond Model: CSTRS <br /> Dewater Time: 0.72 days <br /> Trap Effidency: 4.26% <br /> Dewatering time is calculated from peak stage to lowest spillway <br /> Elevation-Capacity-Discharge Table <br /> Area Capacity Discharge Dewater <br /> Elevation Time <br /> (ac) (ac-ft) (cfs) (hrs) <br /> 6,218.07 0.192 0.000 0.000 Top of Sed.Storage <br /> 6,218.50 0.201 0.085 0.000 <br /> 6,219.00 0.212 0.188 0.000 <br /> 6,219.50 0.224 0.297 0.000 <br /> 6,220.00 0.236 0.412 0.000 Spillway#1 <br /> 6,220.50 0.295 0.545 6.113 15.25 <br /> 6,220.84 0.340 0.657 10.313 2.00 Peak Stage <br /> 6,221.00 0.360 0.708 12.225 <br /> 6,221.50 0.376 0.892 29.053 <br /> 6,222.00 0.392 1.084 51.018 <br /> 6,222.50 0.410 1.284 79.819 <br /> 6,223.00 0.428 1.494 118.666 <br /> Detailed Discharge Table <br /> Combined <br /> Elevation Emergency Total <br /> (ft) Spillway(cfs) Discharge <br /> (cfs) <br /> 6,218.07 0.000 0.000 <br /> 6,218.50 0.000 0.000 <br /> 6,219.00 0.000 0.000 <br /> 6,219.50 0.000 0.000 <br /> 6,220.00 0.000 0.000 <br /> 6,220.50 6.113 6.113 <br /> 6,221.00 12.225 12.225 <br /> Filename:West Buzzard 2022 10 yr event.sc4 Printed 05-09-2022 <br />