My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-04-19_PERMIT FILE - C1981010A (31)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2023-04-19_PERMIT FILE - C1981010A (31)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 8:23:44 AM
Creation date
6/13/2023 8:59:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
4/19/2023
Doc Name
Scraper - Topsoil Replacement Talpac Haul Simulations
Section_Exhibit Name
Appendix A
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Topsoil Placement Talpac <br /> TOPSOIL.PLACEMENT SCRAPERS <br /> Production Summary - Full Simulation <br /> 4 <br /> Waulange System:Scrapers Worst Case 2013 Haul Cycle:[PRJ]A97-3 <br /> Matsrial: PRJ Topsoil Roster. PRJ 5 da Week-8 Hour Shifts <br /> Availability % 85.00 <br /> Bucket Fill Factor 0.80 <br /> Average Bucket Load Volume cu,yards 27.14 <br /> Average Payload bcy 18.85 <br /> Operating Hours per Year OpHr/Year 1,099.00 Op.hrs factored by availability <br /> Average Operating Shifts per Year shlftslYear 157.00 Shifts factored by availability <br /> Average Bucket Cycle Time min 1.70 <br /> Loaded Transport Time min 0.44 <br /> Unloaded Transport Time min 0.48 <br /> Total Loading unit Cycle Time min 1.13 <br /> Transport Distance(One Way) feet 480.00 <br /> Production per Operating Hour bcy 234.23 <br /> Production per Loader Operating Shift bcy 1,640 Max.prod.based on 100%avail. <br /> Production per Year bc 25774419 Avg.pr_oduc_nan factored avail. <br /> Production per Year bcyNear 257,419 <br /> Discounted Capital Cost $/bey 0.00 Loading Methodology <br /> Discounted Operating Cost $Ibcy 0.00 Single Sided <br /> Discounted Average Cost $/bcy 0.00 Full Truck <br /> Excavation Target bcy 15,484.00 Average for 150 Sh"fts <br /> Time to move Excavation Target Days 21.97 <br /> Loader Hrs to move Target Op. Hours. 66 <br /> Total Truck Hrs to move Target Op. Hours. 66 <br /> Total cost to move Target $ 0 <br /> Productivity estimates allow for Insufficient time at the end of the shift to complete another cycle. <br /> Time for the first bucket pass coincides with the truck queuing and maneuvering times. <br /> This simulation is based on data provided by the equipment manufacturer. <br /> Equipment data should be checked to ensure it Is valid for this site. <br /> Prepared by: Jim Cummins .Trapper Mining Inc. <br /> Prepared for: .PR7_Worst Case Bond Calculations 5-Apr-201312:08 PM Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.