Laserfiche WebLink
Haul Cycle <br /> Quick <br /> Material: [PRJ]Topsoil Haulage System: Haulage System-1 <br /> Roster: PRJ S d Week-8 Hour Shins Haul e: PRJ LZ-17 to L Pit Area 7 <br /> Rolling Curve Cycl Max Final Velocity Average Elevation Fuel %Duty <br /> T Se ent Tide Distance Grade Resist. Angle �t�mentl <br /> Time Time Vel.I Vel. Limit. Velocityl Changel Usagel Cycle <br /> feet %I %I d %I min %I mph mphl mahl mph mphl feet S al O Hr % <br /> [PRJ]Caterpillar 637 G <br /> Queue Queue at Loader Auto Mins 0.00 0.00 0.0 <br /> Spot Spot Time at loader Auto Mins 0.00 0.00 0.0 <br /> Load Loading Auto Mins 0.50 -7.35 0.0 <br /> 1 Haul Segment 1145 -9.2 3.0 0.0 Full -8.63 126.86 34.5 0.0 Final Sp. 0.0 105.3 0.0 0.0 <br /> Spot Spot Time at Dump Auto Mins 0.00 0.00 0.0 <br /> Dump Dumping Auto Mins 0.20 -2.94 0.0 <br /> i Haul Segment(rev.) 1145 9.2 3.0 0.0 Empty 1.13 -16.58 15.4 0.0 Final 5p. 11.5 105.3 0.0 67.6 <br /> Total 2,290 -6.81 100.00 3.8 0 <br /> Page 1 <br />