Laserfiche WebLink
Haul Cycle <br /> Full Simulation Results <br /> Material: [PRJ]Topsoil Haulage System: Haulage System-1 <br /> Roster. PRl 5 da Week-8 Hour Shifts Haul le: PRl 120-3 to I Middle Pit <br /> Rolling Curve Segment Cycle Max Final Velocity Average Elevation Fuel %Duty <br /> T entTitle Distance Grade Resist An le load Time Time Vel. Vel. Umk- Velocityl Change Usa a Cycle 77 <br /> feet I %I %I degrees %I min %I mph mphl mph mphl I mph feet S. al Hr % <br /> [PRJ]Caterpillar 637 6 <br /> Queue Queue at loader Auto Mins 0.00 0.00 0.0 <br /> Spot Spot Time at loader Auto Mins 0.00 0.00 0.0 <br /> Load Loading Auto Mins 0.50 22.21 0.0 <br /> 1 Haul Segment 653 3.8 3.0 0.0 Full 0.82 36.55 16.8 0.0 Final Sp. 9.0 24.8 0.0 33.7 <br /> Spot Spot Time at Dump Auto Mins 0.00 0.00 0.0 <br /> Dump Dumping Auto Mins 0.20 9.88 0.0 <br /> 1 Haul Segment(rev.) 653 -3.8 3.0 0.0 Empty 0.73 32.36 20.5 0.0 Final Sp. 10.2 -24.8 0.0 9.8 <br /> Total 1306 2.25 100.00 6.6 0 <br /> Page 1 <br />