Laserfiche WebLink
.iaul Cycle <br /> Full Simulation Results <br /> Material: [PRJ)Topsoil Haulage System: Haulage System-1 <br /> Roster: PRJ 5 da Week-8 Hour Shlfts Haul le: JPILIJ 120-1 to I Middle Pit <br /> Rolling Curve Segment Cycle Max Final Velocity Average Elevation Fuel %Duty <br /> T Se entTitle Distance Grade Resist. Angle Load Time Time Vel. Vel. UmlLI Velocityl Chan gel -Usagel Cycle <br /> feet % %I degreesl min % m h mph mphl mph feet S. al O Hr % <br /> [PRJf]Caterpillar 637 G <br /> Queue Queue at Loader Auto Mins 0.00 0.00 0.0 <br /> Spot Spot Time at loader Auto Mins 0.00 0.00 0.0 <br /> Load Loading Auto Mins 0.50 21.89 0.0 <br /> 1 Haul Segment 688 0.7 3.0 0.0 Full 0.94 36.61 18.6 0.0 Final Sp. 9.3 4.8 0.0 23.7 <br /> Spot Spot Time at Dump Auto Mins 0.00 0.00 0.0 <br /> Dump Dumping Auto Mins 0.20 8.76 0.0 <br /> 1 Haul Segment(rev.) 698 -0.7 3.0 0.0 Empty 0.75 32.74 21.1 0.0 Final Sp. 10.5 -4.8 0.0 18.9 <br /> Total 1376 2.28 100.00 6.8 0 <br /> Page 1 <br />