Laserfiche WebLink
Maul Cycle <br /> Full Simulation Results <br /> Material: [PRJ]Topsoil Haulage System: Haulage System-i <br /> Roster: f PRJI S dav,Week-8 Hour Shift Haul de: PRl HRS to L Pit Area S <br /> Rolling Curve Segment Cycle Max Final Vebdty Average Elevation Fuel %Duty <br /> T Se entTide Distance Grade Resist. An k Load Time Time Vel. Vel. Limit Veloc Chan a Usa eCvde <br /> feet % % d % min % m h m h m h feet S I D Hr % <br /> [PRi]Caterpillar 637 G <br /> Queue Queue at Wader Auto Mins 0.00 0.00 0.0 <br /> Spot Spot Time at loader Auto Mins 0.00 0.00 0.0 <br /> Load Wading Auto Mins 0.50 12.35 0.0 <br /> 1 Haul Segment 1796 11.1 3.0 0.0 Full 2.44 60.22 9.1 0.0 Final Sp. 8.4 199.4 0.0 87.9 <br /> Spot Spot Time at Dump Auto Mins 0.00 0.00 0.0 <br /> Dump Dumping Auto Mins 0.20 4.94 0.0 <br /> 1 Haul Segment(rev.) 1796 11.1 3.0 0.0 Empty 0.91 22.49 34.5 0.0 Final Sp. 22.4 -199.4 0.0 0.0 <br /> Total 3,592 4.05 100.00 10.1 0 <br /> Page 1 <br />