Laserfiche WebLink
.iaul Cycie <br /> Full Simulation Results <br /> Material: [PRJI Topsoil Haulage System: Haulage System-1 <br /> Roster: PRJ 5 da Week-8 HourShifts Haul e: [PRJI EM1 to I Middle Pit <br /> ROW 8 Curve I Segment Cycle Max Final Velocity Average Elevation Fuel %Duty <br /> T Se mentme Distance Grade Reslst. An a Load Time Time Vel. Vel. Limit Velocityl Changel usage[ Cycle <br /> feet % %I d rees % min % m h mph I m h feet S I D Hr % <br /> [PRJ]Caterpillar 637 G <br /> Queue Queue at Loader Auto Mins 0.00 0.00 0.0 <br /> Spot Spot Time at loader Auto Mins 0.00 0.00 0.0 <br /> Load Loading Auto Mins 0.50 26.27 0.0 <br /> 1 Haul Segment 397 0.0 3.0 0.0 Full 0.64 33.37 14.3 0.0 Final Sp. 7.1 0.0 0.0 16.6 <br /> Spot Spot Time at Dump Auto Mins 0.00 0.00 0.0 <br /> Dump Dumping Auto Mins 0.20 10.51 010 <br /> 1 Haul Segment(rev.) 397 0.0 3.0 0.0 Empty 0.57 29.85 16.2 0.0 Final Sp. 7.9 0.0 0.0 15.9 <br /> Total 794 1.90 100.00 4.7 0 <br /> Page'I <br />