Laserfiche WebLink
,caul Cycle <br /> Full Simulation Results <br /> Material: [PRJ]Topsoil Haulage System: Haulage System-1 <br /> Roster. [PRJI S dav Week-S Hour Shifts Haul le: IPIUI D97-1 to Area 2 <br /> Roll <br /> es:ng Curve Segment Cycle Max Final Velocity Average Elevation Fuel %Duty <br /> T Se mentTitio Distance Grade Resist Angle Load Time Time Vel. Vel. Umit. Velloft Chan gel UM el Ovele <br /> feet % % d % mini % m h mph mphl mph feet S. al O Hr % <br /> [PRIJ Caterpillar 637 G <br /> Queue Queue at Loader Auto Mins 0.00 0.00 0.0 <br /> Spot Spot Time at loader Auto Mins 0.00 0.00 0.0 <br /> Load Loading Auto Mins 0.50 16.43 0.0 <br /> 1 Haul Segment 1496 0.0 3.0 0.0 Full 1.24 40.76 26.7 0.0 Final Sp. 13.7 0.0 0.0 29.9 <br /> Spot Spot Time at Dump Auto Mins 0.00 0.00 0.0 <br /> Dump Dumping Auto Mins 0.20 6.57 0.0 <br /> 1 Haul Segment(rev.) 1496 0.0 3.0 0.0 Empty 1.10 36.24 31.1 0.0 Final Sp. 15.4 0.0 0.0 29.6 <br /> Total 2,992 3.04 200.00 11.2 0 <br /> Page 7 <br />