Laserfiche WebLink
Haul Cycle <br /> Full Simulation Results <br /> Material: [PRJ]Topsoil Haulage System: Haulage System-1 <br /> Roster. [PRI1 S da Week-8 Hour Shifts Haul le: IPRJI Di-07 to Area 4 <br /> Rolling Curve Segment Cycle Max Final Velocity Average Elevation Fuel %Duty <br /> T Se mentTitie Distance Grade Resist Angle load Time Time Vel. Vel. Limit. Ve Change Usa e e <br /> feet % %I d %I min % mph mphl mph mphl I mph mphl feet S. 1 0 Hr % <br /> [PRJ]Caterpillar 637 G <br /> Queue Queue at Loader Auto Mins 0.00 0.00 010 <br /> Spot Spot Time at loader Auto Mins 0.00 0.00 0.0 <br /> Load Loading Auto Mins 0.50 17.55 0.0 <br /> 1 Haul Segment 1221 2.8 3.0 0.0 Full 1.15 40.45 21.1 0.0 Final Sp. 12.0 34.2 0.0 41.6 <br /> Spot Spot Time at Dump Auto Mins 0.00 0.00 0.0 <br /> Dump Dumping Auto Mins 0.20 7.02 0.0 <br /> 1 Haul Segment(rev.) 1221 -2.8 3.0 0.0 Empty 1.00 34.97 28.0 0.0 Final Sp. 13.9 -34.2 0.0 17.0 <br /> Tota 1 2,442 2.85 100.00 9.7 0 <br /> Page 1 <br />