Laserfiche WebLink
Haul Cycle <br /> SimulationFull <br /> Material: [PRJ]Topsoil Haulage System: Haulage System-1 <br /> Roster. PRJ S da Week-8 Hour Shifts Haul le: [PFUI C61 to I Middle Pit <br /> Rolling Curve Segment Cycle Max Anal Velocity Average Elevation Fuel %Duty <br /> T mentTitle Distance Grade Resist. An a Load Time Time Vel. Vel. Limit. Velocity Changel Usa ecycle <br /> feet %I % de reel % min %I mph[ mph mphl I mph] feet S. al O Hr % <br /> [PRJ]Caterpillar 637 G <br /> Queue Queue at Loader Auto Mins 0.00 0.00 0.0 <br /> Spot Spot Time at loader Auto Mins 0.00 0.00 0.0 <br /> Load Loading Auto Mins 0.50 13.94 010 <br /> 1 Haul Segment 2024 3.2 3.0 0.0 Full 1.60 44.70 21.1 0.0 Final Sp. 14.3 64.8 0.0 58.3 <br /> Spot Spot Time at Dump Auto Mins 0.00 0.00 0.0 <br /> Dump Dumping Auto Mins 0.20 5.58 0.0 <br /> 1 Haul Segment(rev.) 2024 -3.2 3.0 0.0 Empty 2.28 35.79 34.5 0.0 Final Sp. 17.9 -64.8 0.0 19.4 <br /> Total 4,048 3.59 100.00 12.8 0 <br /> Page 1 <br />