Laserfiche WebLink
Haul Cyde <br /> Full Simulation Results <br /> Material: [PRJI Topsoil Haulage System: Haulage System-1 <br /> Roster: PRJ 5 da Week-a Hour Shifts Hau! e: PJU C Pit Future TS to C Pit <br /> Rolling Curve Segment Cyde Max Final Vekxity Average Eievat3on Fuel %Duty <br /> T entntle Distance Grade Resist An le Load Time Time Yel. Vel. Limit I Velocity Chan gel Usage le <br /> 7 <br /> feet %I %I dezreesl min % m h mph[ mph mphl feet S. I O Hr % <br /> [PRJ]Caterpillar 637 G <br /> Queue Queue at Loader Auto Mins 0.00 0.00 0.0 <br /> Spot Spot rime at loader Auto Mins 0.00 0.00 0.0 <br /> Load Loading Auto Mins 0.50 14.19 0.0 <br /> i Haul Segment 2000 -4.5 3.0 0.0 Full 1.43 40.47 32.3 0.0 Final Sp. 15.9 -90.0 0.0 13.2 <br /> Spot Spot Time at Dump Auto Mins 0.00 0.00 0.0 <br /> Dump Dumping Auto Mins 0.20 5.68 0.0 <br /> 1 Haul Segment jrev.) 2000 4.5 3.0 0.0 Empty 1.40 39.66 24.8 0.0 Final Sp. 16.3 90.0 0.0 58.7 <br /> Total 4 000 3.52 100.00 12.9 0 <br /> Page 1 <br />