My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-04-19_PERMIT FILE - C1981010A (31)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2023-04-19_PERMIT FILE - C1981010A (31)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 8:23:44 AM
Creation date
6/13/2023 8:59:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
4/19/2023
Doc Name
Scraper - Topsoil Replacement Talpac Haul Simulations
Section_Exhibit Name
Appendix A
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Topsoil Placement Talpac <br /> TOPSOIL PLACEMENT_SCRAPERS <br /> Production <br /> Simulation <br /> ' Haulage System:Scrapers Worst Case 2013 Haul Cycle:[PRJ]A92-3 <br /> Material [PRJ7 TODS011 Roster:1PRJ1 5 da v Week.8 Hour Shifts <br /> rx <br /> Availability % 85.00 <br /> Bucket Fill Factor 0.80 <br /> Average Bucket Load Volume cu.yards 27.14 <br /> Average Payload bay 18.85 <br /> Operating Hours per Year OpHrNear 1,099.00 Op.hrs factored by avaiiabiifty <br /> Average Operating Shifts per Year shifts/Year 157.00 Shifts factored by availaoiiity <br /> Average Bucket Cycle Time min 1.70 <br /> Loaded Transport Time min 0.38 <br /> Unloaded Transport Time min 0.39 <br /> Total Loading unit Cycle Time min 0,97 <br /> Transport Distance(One Way) feet 350.00 <br /> Production per Operating Hour bcy 239.61 <br /> Production per Loader Operating Shift bcy 1,677 Mau,prod based on 100%avail <br /> Production er Year bgy, 2e3 337 AM.production factored N avail. <br /> Production per Year bcy/Year 263,337 <br /> Discounted Capital Cost $/bey 0.00 Loading Methodology <br /> Discounted Operating Cost $/bcy 0.00 Single Sided <br /> Discounted Average Cost $lbcy 0.00 Full Truck <br /> Excavation Target bcy 7,632.00 Average for 150 Shifts <br /> Time to move Excavation Target Days 10.59 <br /> Loader Hrs to move Target Op. Hours. 32 <br /> Total Truck Hrs to move Target Op. Hours. 32 <br /> Total cost to move Target $ 0 <br /> Productivity estimates allow for insufficient time at the and of the shift to complete another cycle. <br /> Time for the first bucket pass coincides with the truck queuing and maneuvering times. <br /> This simulation is based on data provided by the equipment manufacturer. <br /> Equipment data should be checked to ensure It Is valid for this site. <br /> Prepared by; Jim Cummins .Trapper Mining Inc. <br /> Prepared for: .PR7 Worst Case Bond Calculations 5-Apr-201312:04 PM Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.