Laserfiche WebLink
Haul Cycle <br /> Full Simulation Results <br /> Material: [PR1]Topsoil Haulage System: Haulage System-1 <br /> Roster: PRi S da Week-8 Hour shiFts Haul PRJ ASH2 2020 to Ash Road <br /> Rolling Curve Segment Cyde Max Final Velocky Average Elevation Fuel %Duty <br /> T entTitle Distance Grade Resist An a Load rime Time Vet. Vel. Limit. Velockyl Chan gel usa e Cycle <br /> feet % % de Tees % min %I mph mphl mehl I mph mphl feet S. I O Hr % <br /> [PRI]Caterpillar 637 G <br /> Queue Queue at Loader Auto Mins 0.00 0.00 0.0 <br /> Spot Spot Time at loader Auto Mins 0.00 0.00 0.0 <br /> Load Loading Auto Mins 0.50 -2.18 0.0 <br /> 1 Haul Segment 711 -12.0 3.0 0.0 Full -24.51 106.99 34.5 0.0 Final Sp. 0.0 -85.3 0.0 0.0 <br /> Spot Spot Time at Dump Auto Mins 0.00 0.00 0.0 <br /> Dump Dumping Auto Mins 0.20 -0.87 0.0 <br /> 1 Haul Segment(rev.) 711 12.0 3.0 0.0 Empty 0.88 -3.83 12.3 0.0 Final Sp. 9.2 85.3 0.0 66.4 <br /> Total 1422 -22.9-4 100.00 -0.7 0 <br /> Page 1 <br />