Laserfiche WebLink
Productivity <br /> Production Summary - Full Simula <br /> Haulage System:Haulage System-1 Haul Cycle:[PRJ]A98-3 to L Pit Area 4 <br /> Material: [PRJI Topsoil Roster:JPRJJ S day Week-8 Hour Shifts <br /> Loader [PRJ]Caterpillar 637 6 <br /> Availability % 85.00 <br /> Bucket Fill Factor 0.85 <br /> Average Bucket Load Volume cu.yards 28.94 <br /> Average Payload bcy 28.10 <br /> Operating Hours per Year OpHr/Year 4,207.00 Op.hrs factored by availability <br /> Average Operating Shifts per Year shifts/Year 601.00 Shifts factored by availability <br /> Average Bucket Cycle Time min 0.50 <br /> Loaded Transport Time min 3.81 <br /> Unloaded Transport Time min 1.49 <br /> Total Loading unit Cycle Time min 6.00 <br /> Transport Distance(One Way) feet 3,552.00 <br /> Production per Operating Hour bcy 232.82 <br /> Production per Loader Operating Shift bcy 1,630 Max.prod.based on 100%avail. <br /> Production per Year bbcy 979,490 Avg.production factored by avail. <br /> Haulage System <br /> Production per Year bcy/Year 979,490 <br /> Discounted Capital Cost $/bcy 0.00 Loading Methodology <br /> Discounted Operating Cost $/bcy 0.00 Single Sided <br /> Discounted Average Cost $/bcy 0.00 Full Truck <br /> Excavation Target bcy 195,036.00 Average for 150 Shifts <br /> Time to move Excavation Target Days 72.73 <br /> Loader Hrs to move Target Op.Hours. 838 <br /> Total Truck Hrs to move Target Op.Hours. 838 <br /> Total cost to move Target $ 0 <br /> Productivity estimates allow for insufficient time at the end of the shift to complete another cycle. <br /> Time for the first bucket pass coincides with the truck queuing and maneuvering times. <br /> Equipment data should be checked to ensure it is valid for this site. <br /> Page 1 <br />