Laserfiche WebLink
.caul Cycle <br /> Full Simulation Results <br /> Material: IPRJ]Topsoil Haulage System: Haulage System-1 <br /> Roster: PRJ 5 d Week-8 Hour Shifts Haul e: PRJ A92-2 to N Pit Area 2 <br /> Rolling Curve Segment Cyde Max Final Velocity Average Elevation Fuel %Duty <br /> T Se mentTitle Distance Grade Resist An le Load Time Time Vel. Vel. Limit. VelocttviChan a Usa e Cycle <br /> feet % %I de Tees % min % mph mphl mph mphl I mph mphl feet S. al O Hr % <br /> IPRJ)Caterpillar 637 G <br /> Queue Queue at Loader Auto Mins 0.00 0.00 0.0 <br /> Spot Spot Time at loader Auto Mins 0.00 0.00 0.0 <br /> Load Loading Auto Mins 0.50 13.38 0.0 <br /> 1 Haul Segment 2295 2.2 3.0 0.0 Full 1.66 44.51 24.9 0.0 Final Sp. 15.7 50.5 0.0 53.0 <br /> Spot Spot Time at Dump Auto Mins 0.00 0.00 010 <br /> Dump Dumping Auto Mins 0.20 5.35 0.0 <br /> 1 Haul Segment'rev.N 2295 -2.2 3.0 0.0 Empty 1.37 36.75 34.5 0.0 Final Sp. 19.0 -50.5 0.0 32.1 <br /> Total 4 590 3.74 100.00 14.0 0 <br /> Page 1 <br />