Laserfiche WebLink
Maul Cycle <br /> SimulationFull Results <br /> Material: [PRJ]Topsoil Haulage System: Haulage System-1 <br /> Roster: rPRJI 5 dav Week-8 Hour Shins Haul e: PRJ A3-08 to L Pit Area 4 <br /> Rolling Curve Segment Cyde Max Final Velodty Average Elevation Fuel %Duty <br /> T Se ment Title Distance Grade Resist. An le Load Time Time Vel. Vel. Limit. Vel Chana Usa e Cvde <br /> feet % %I degrees degreesl min % mph mph I mph mphl feet S. I O Hr % <br /> [PRJ]Caterpillar 637 G <br /> Queue Queue at Loader Auto Mins 0.00 0.00 0.0 <br /> Spot Spot Time at loader Auto Mins 0.00 0.00 0.0 <br /> Load Loading Auto Mins 0.50 10.31 0.0 <br /> 1 Haul Segment 2686 8.6 3.0 0.0 Full 2.95 60.74 11.4 0.0 Final Sp. 10.4 231.0 0.0 87.6 <br /> Spot Spot Time at Dump Auto Mins 0.00 0.00 0.0 <br /> Dump Dumping Auto Mins 0.20 4.12 0.0 <br /> 1 Haul Segment(rev.) 2686 -8.6 3.0 0.0 Empty 1.20 24.82 34.5 0.0 Final Sp. 25.4 -231.0 0.0 0.0 <br /> Total 5,372 4.85 100.00 12.6 0 <br /> Page 1 <br />