My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-04-19_PERMIT FILE - C1981010A (31)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981010
>
2023-04-19_PERMIT FILE - C1981010A (31)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 8:23:44 AM
Creation date
6/13/2023 8:59:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010A
IBM Index Class Name
Permit File
Doc Date
4/19/2023
Doc Name
Scraper - Topsoil Replacement Talpac Haul Simulations
Section_Exhibit Name
Appendix A
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Topsoil Placement <br /> TOPSOIL PLACEMENT—SCRAPERS Talpac <br /> Haulage System: Scrapers Worst Case 2013 Haul Cycle:jPRJj 5P6-94 <br /> Material. T soil Roster: ARJ 5 dav Week-8 Hoerr Shifts <br /> Availability % + 85.00 I <br /> Bucket Fill Factor 0.80 <br /> Average Bucket Load Volume cu.ytarde <br /> 14 <br /> Average Payload . <br /> bcY 18 18.85 <br /> Operating Hours per Year OpHr/Year 1,099A0 <br /> Average Operating Shifts per Year shiftsfyea• Op.hrs factored by availability <br /> Average Bucket Cycle Time min 157.1.7000 Shifts factored by availability <br /> Loaded Transport Time min <br /> Unloaded Transport Time 0.17 <br /> 53 <br /> Total Loading unit Cycle Time min min 0.91 <br /> Transport Distance(One Way) feet 0.91 <br /> 00 <br /> Production per Operating Hour b 250.38 <br /> Production per Loader Operating Shift � 250.38 <br /> _. Production er Year bcy 1,753 Max prod.based an 1pD"/,avail. <br /> - - - — * bgi 275 172 A roduction factored <br /> Law:Gi>r:Tji avail. <br /> Production per Year bey/Year 275,172 <br /> Discounted Capital Cost $/boy 0.00 Loading Methodology <br /> Discounted Operating Cost <br /> Discounted Average Cost $Ibcy 0.00 Single Sided <br /> $/bcy 0.00 Full Truck <br /> Excavation Target bey 12,204.00 Average for 150 Shifts <br /> Time to move Excavation Target Days <br /> Loader Hrs to move Target y 1t3.20 <br /> � Op. Hours. 49 <br /> Total Truck Hrs to move Target Op. Hours. <br /> `total cost to move Target 49 <br /> $ 0 <br /> Productivity estimates allow for insufficient time at the end of the shift to complete another cycle. <br /> Time for the first bucket pass coincides with the truck queuing and maneuvering times. <br /> This simulation Is based on data provided by the equipment manufacturer. <br /> Equipment data should be checked to ensure It is valid for this site. <br /> Prepared by: .Tirn Cummins <br /> Prepared for: .PR7_Worst Case Bond Calculations •Trapper Mining Inc. <br /> 5-Apr-20131:07 PM Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.